Facilities has reported that one lane on Perimeter Road will be closed July 25 through July 26 to replace deteriorated asphalt. The lane closure will occur on the section of Perimeter east of Cherry Road. Traffic speeds will be lowered in the construction area to 15 mph. Please use caution while in the work zone.