Inside Clemson

Portions of Library Bridge closed for repaving

Portions of the Cooper Library bridge are closed on Clemson’s main campus as workers repave the walkway surface. While the bridge will still be open to pedestrian traffic, construction tape and barricades will narrow the walkway. The elevators that connects to the bridge remains accessible – as does the walkway area in front of the library doors.

The Facilities department expects work to be completed in time for Clemson’s first home football game on Sept. 2.

Contact project manager Phillip Addington at padding@clemson.edu with any questions.