University Facilities

Highway 93 Jan 31 construction updates

Upgrades to the electrical and chilled water infrastructure along Highway 93 continue. Below are the latest construction updates.

Sherman Road to resume normal operation

Construction contractor A.West has restored Sherman Road to normal operation. The road has been paved and barricades have been removed. Drivers should still take care as construction vehicles continue to use Sherman to enter the College of Business construction site.

Addison Lane to frontage road

The one-way side street that normally connects Highway 93 to Addison Lane has temporarily changed to a two-way street. This allows vehicles to reach the parking lot next to Holy Trinity Church along with the frontage road that runs parallel with 93.

The road between Addison Lane and 93 is now a two-way street. Vehicles headed southbound can access the parking along the frontage road parallel to 93.
The road between Addison Lane and 93 is now a two-way street. Vehicles headed southbound can access the parking along the frontage road parallel to 93.
Thanks for your patience

We understand this project represents a major disruption for the community and our contractors are working as quickly as possible to complete the necessary upgrades to campus. It is important to note that while this project has presented logistical challenges, these are short-term interruptions that will ultimately garner long-term benefits. Everyone’s patience is greatly appreciated. To find out more, please see our overview of campus utility construction.

Barricades along Highway 93 to be extended to Centennial Boulevard

01/25 Update – Barricades blocking access to Williamson Road will be removed on Jan 28, three days ahead of the revised schedule. Drivers will be able to turn left from Highway 93 onto Williamson, and those traveling along Williamson will be able to turn left onto Highway 93, which remains one-lane, one-way in this area. Vehicles headed eastbound along Highway 93 will continue to detour on to Perimeter Road.

Access to Williamson Rd. will be reopened on Jan. 28.
Access to Williamson Rd. will be reopened on Jan. 28.

01/22 Update – The Williamson intersection reopening has been postponed to approximately Jan. 31 due to rain and low temps in the forecast. Weather cooperating, we’re hopeful this will be the only delay. See this blog and our Twitter feed for any additional updates.

01/18 Update – A temporary crosswalk has been established at Pine St. while Williamson Rd. is blocked. Once construction passes Williamson, the crosswalk at the intersection will be restored.

Pic of Williamson-93 intersection

Main campus—Construction continues to move forward along S.C. Highway 93 as workers upgrade underground utilities and pipes to serve the main campus. Toward that end, Facilities will extend the existing barricades along Highway 93 to Centennial Boulevard beginning today (Monday, Jan. 14). Access to Williamson Road will remain available until Tuesday (Jan. 15), when workers will place barricades at the Williamson Road/Highway 93 intersection, which will block access to Williamson Road from Highway 93.

Street parking on Williamson Road will remain available and the gravel lot parking by the West Energy Plant will continue to be available.

Traffic will continue to flow one-way westbound on Highway 93 from the College Avenue to the Centennial Road intersections.

Officials expect the Williamson Road/Highway 93 intersection to reopen in the late January/early February timeframe.

This post will be updated with any changes in scheduling as details are provided to us from the contractor.

A full overview of ongoing campus utility construction can be found on our website.

Barricades will be extended to Centennial Blvd.
Barricades will be extended to Centennial Blvd.
Drivers traveling eastbound can reach Williamson Rd. via Perimeter.
Drivers traveling eastbound can reach Williamson Rd. via Perimeter.

College Avenue access to Highway 93 now open

Please note: The City of Clemson plans to host its National Champion ship viewing party from 5 p.m. Monday until 2:30 a.m. Tuesday. College Avenue will be closed from Highway 93 to Keith Street during this time.

Contractor A. West is wrapping up construction work at the intersection of College Avenue and Highway 93. A new manhole was installed, but installation of a new electrical duct bank has been postponed until a later date due to weather.

Currently vehicles can turn left onto 93 without issue. Drivers turning right will encounter a sharp right-hand turn—large vehicles and trucks should not attempt to do so at this time.

Traffic flow will remain one-lane, one-way heading westbound along 93.

See the visual above for an overview of traffic flow.
See the visual above for an overview of traffic flow.